Back to results

Road Infrastructure Costs: Analysis of Unit Cost and Cost Overruns of Road Infrastructure Projects in Africa

Author
African Development Bank Statistics Department (ESTA)
Description

This is a report of the study on "Road Infrastructure Costs: Analysis of Unit Cost and Cost Overruns of Road Infrastructure Projects in Africa". The study was undertaken within the context of the African Development Bank’s Africa Infrastructure Knowledge Program. The report presents findings of the analysis on unit costs and cost overruns of road infrastructure projects in Africa.

Publication date
2014
Document type
Report
Language(s)
English
Download

Categories: Transport, Infrastructure Financing

You are currently offline. Some pages or content may fail to load.